Free or reduced NRES summer offer

Reduce the Cost of Your Next PCBA Project: Summer Offer!

Starting a new PCB assembly project involves more than the cost of the build itself. Before production begins, there may be engineering preparation, programming, tooling, documentation review and process setup to complete.

These one-off costs are commonly covered by non-recurring engineering charges, or NREs.

Until 31 August 2026, Active-PCB Solutions is offering free or reduced NREs on qualifying new PCB assembly projects, helping customers reduce the initial cost of moving a new assembly into production.

What Are NREs?

NREs cover the engineering and production setup which are required before a new assembly can be manufactured efficiently and consistently.

Depending on the project, this can include reviewing manufacturing data, preparing work instructions, programming production and inspection equipment, creating tooling, developing test procedures and completing other project-specific setup work.

These activities are important, particularly for complex or high-reliability assemblies, but they can add to the initial cost of introducing a new product or transferring an existing build to a new manufacturing partner.

Free or reduced NRES summer offer

Supporting New Products and Supplier Transfers

Our summer offer is designed to support businesses that are developing a new product, moving from prototype into production, transferring work from another supplier or reviewing their UK manufacturing strategy.

By reducing or removing qualifying NRE charges, we can help lower the initial barrier to starting a new project while ensuring the necessary engineering and production preparation is still completed.

At Active-PCB Solutions, we support customers across the full manufacturing process, from early-stage engineering and new product introduction through to repeat production, testing, coating, system integration and box build.

Our capabilities include:

Plan Ahead for Future Builds

Current supply chain conditions continue to place pressure on the availability and cost of PCB laminates, semiconductors and electronic components.

For customers with builds planned later in the year, placing orders early can help secure materials, protect production schedules and reduce exposure to further price increases or extended lead times.

Our team can review your build requirements, identify potential material risks and advise on the most suitable manufacturing and testing approach.

Terms and Conditions For This Offer

• Offer applies to new assemblies quoted and ordered between 14th July and 31st August 2026.
• Valid for brand-new builds only and does not apply to repeat or existing assemblies.
• Free or reduced NREs are available on qualifying projects valued over £2,000.
• Active-PCB Solutions reserves the right to amend or withdraw this offer at any time before 31st August 2026.

Speak to Our Team

The free or reduced NRE offer applies to qualifying new assemblies ordered between 14 July and 31 August 2026.

Eligibility and the level of reduction will depend on the requirements of the individual project.

To discuss a new PCB assembly, supplier transfer or upcoming production requirement, contact the Active-PCB Solutions team.

Get in Touch!

Contact us to discuss your next project